M2 Upgrade Project, Christie Road Bridge

M2 Upgrade Project, Christie Road Bridge As a part of the M2 Upgrade project with Leighton Contractors, Timbermass Constructions was awarded the contract to both lengthen and widen the the Christie Road overbridge. This involved extension of the existing central median crash barrier and headstock. Extisting abutment extension and new abutment construction. Two post tensioned…

Brooklyn Sewerage Treatment Plant

Brooklyn Sewerage Treatment Plant As part of the Sydney Water Priority Sewerage Scheme, a new sewerage treatment plant was built at Brooklyn including contruction of Large Multi chamber Biorector Chemical Dosing Unit First Flush Tank Building and ammenities slabs and first fix fit out to buildings External ground slabs All water retaining structures Hydrostatically tested…

M2 Upgrade – Vimiera Rd Stablisation Project

M2 Upgrade – Vimiera Rd Stablisation Project Construction of bases, heavy retaining walls, a sewer riser, dissipator structure, barriers, drainage and associated works adjacent to the live motorway on a difficult site. Design, supply and installation of formwork to walls over 6m high and 4.2m wide, with concrete pressures over 120KPa. Design, supply and install all scaffold. Pump…