M2 Upgrade Project, Christie Road Bridge
As a part of the M2 Upgrade project with Leighton Contractors, Timbermass Constructions was awarded the contract to both lengthen and widen the the Christie Road overbridge.
This involved
- extension of the existing central median crash barrier and headstock.
- Extisting abutment extension and new abutment construction.
- Two post tensioned diaphrams to the existing superstructure to lengthen bridge span and accomodate the additional west bound M2 lane.
- All works carried out and completed under live traffic conditions from start to finish.