M2 Upgrade - Vimiera Rd Stablisation Project
Construction of bases, heavy retaining walls, a sewer riser, dissipator structure, barriers, drainage and associated works adjacent to the live motorway on a difficult site.
- Design, supply and installation of formwork to walls over 6m high and 4.2m wide, with concrete pressures over 120KPa.
- Design, supply and install all scaffold.
- Pump and place 2500m3+ concrete.
- Design, supply and operate a 32m tower placement boom, concrete pumped via 250m of line from M2 carriageway.